THE DNO APPLICATION

Navigating the DNO Application with Ease

Stepping into the world of renewable energy is made simple with Passive Instal by your side. We are committed to streamlining the dno application process, making your transition to renewable energy swift and easy as you embrace the extensive benefits of an environmentally friendly photovoltaic system.

WHAT IS DNO?

A DNO (Distribution Network Operator) is the organisation responsible for distributing electrical energy to your home or business. For your PV installation to comply with the norms, the local distributor must be informed about the new installation. In the UK, there are 14 different distribution networks, or DNO regions, owned by 6 groups.

OUR HELP WITH YOUR DNO APPLICATION

Discover key information about the DNO application process, essential for installing and operating your new, eco-friendly photovoltaic system. At Passive Instal, our priority is to simplify and accelerate this process so you can quickly enjoy the benefits of your own source of green energy.

G98 - YOUR FAST TRACK TO GREEN ENERGY

If you plan to install a smaller photovoltaic system, G98 is the perfect solution. With the G98 procedure, you don’t need to submit an application or wait for permission. We only need to inform the DNO within 28 days of completing the installation. This significantly accelerates the whole process!

And we have even better news for you! By using the most potent solar panels available on the British market, we offer you an installation of 4.55 kW, consisting of only 10 panels. This is the most powerful system you can have without worrying about permissions!

G99 - FOR THOSE THINKING OF HIGHER POWER

For installations with an inverter power greater than 3.68kWp in a single-phase system, or above 11.04kWp in three-phase systems, a G99 application is required.

Although the waiting period can be up to 12 weeks, and unfortunately, the decision is not always positive, our representative will help you determine all requirements and the best solutions to simplify and speed up this process as much as possible.

Additionally, it’s worth knowing that the cost of a G99 application can be as much as £300 – £750, depending on the distributor.

WHO IS YOUR DNO DISTRIBUTOR?

A DNO (Distribution Network Operator) is the organisation responsible for distributing electrical energy to your home or business. For your PV installation to comply with the norms, the local distributor must be informed about the new installation. In the UK, there are 14 different distribution networks, or DNO regions, owned by 6 groups.

Northern Powergrid:

  • North East England
  • Yorkshire
  • Northern Lincolnshire

Scottish Power Energy Networks (SPEN):

  • Central and Southern Scotland
  • Parts of North West England
  • North Wales

Scottish and Southern Electricity Networks (SSEN):

  • North of Scotland
  • Central Southern England

 

     Northern Ireland Electricity Networks (NIE Networks):

    • Northern Ireland

    Electricity North West:

    • North West England

    National Grid:

    • South West England
    • Midlands
    • South Wales

    UK Power Networks:

    • London
    • South East England
    • East of England

      WHY CHOOSE PASSIVE INSTAL?

      We understand the value of your time. At Passive Instal, we ensure that every step of the process is as simple and fast for you as possible. We handle all the formalities, allowing you to enjoy your own, green energy source without unnecessary complications and delays.

      CONTACT US